Building Healthcare Facilities on Batteries: Kai Tak Hospital

Project Name
Construction
Location
Kai Tak, Hong Kong S.A.R.
Deployment Time
2025
Client
China State Construction Engineering (Hong Kong) Limited

Building Healthcare Facilities on Batteries: Kai Tak Hospital

Deployment Date: December 2025
Project Location: Kai Tak, Hong Kong S.A.R.

2 min read

Collaboration between Leyden Power and China State Hong Kong allowed the Kai Tak Hospital to be built on batteries. China State Hong Kong successfully lowered their operational expenses, reduce emissions, and keep a better working environment for its neighbors and workers.

The Kai Tak Hospital under construction (photographed July 2026).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

China State Construction Engineering (Hong Kong) Limited (“China State Hong Kong”) leads the development of the new Kai Tak Hospital in one of Hong Kong’s busiest districts. Proposed several years  prior, the hospital is intended to meet rising demand for medical services from the growing and aging population in Kowloon. With its strong track record of completing large, complex projects, China State Hong Kong aims to leverage its extensive technology and logistics capabilities to continue that success with the Kai Tak Hospital.

Diesel was originally considered for the site’s target load of two tower crane-and-hoist sets as grid power was insufficient. Each set draws peak loads reaching 143 kW. Covering that demand conventionally would require two diesel generators running 12 hours a day, bringing noise, exhaust, and fuel costs onto a site that China State Hong Kong aims to keep cleaner and quieter. It also affects working conditions, carrying health risks for the crews operating the equipment everyday.

What we achieved
Crews installing two sets of Navy Cubes on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

In collaboration with Leyden Power, China State Hong Kong deployed two NAVY CUBE 400 battery energy storage system (422 kW / 633 kWh), one unit for each crane-and-hoist set.

By allowing a 300 kVA diesel generator to charge the battery at a constant, steady load of 40 kW, the NAVY CUBE absorbs high-power spikes that generators typically struggle to follow. This efficient setup drastically improves load stability, allowing each generator to run for less than 6 hours per day and slashing monthly fuel consumption by over 80%.

Together, the Navy Cube batteries delivered an approximate 5,000 kWh per month to the site’s lifting equipment. All while significantly reducing noise, fumes, and carbon emissions across the job site.

Data based on one month use of two NAVY CUBE 400 units.

 

 

 

 