Deployment Date: March 2025
Project Location: Tung Chung, Hong Kong
Traditional energy supplies have long constrained construction sites, often leading to challenges such as maintenance delays, unstable power, and lack of grid access, particularly in remote locations. To overcome these limitations, Leyden Power partnered with Gammon Construction Limited to deploy a Battery Energy Storage System (BESS) at the Tung Chung construction site in Hong Kong.

Known for its commitment to quality, responsibility, and safety, Gammon Construction recognized the need to rethink energy management due to insufficient grid power supply at the site. By integrating Leyden Power’s BESS technology, the site transitioned to a sustainable and reliable power solution that enhances operational efficiency and cost management.
The deployment of BESS at Tung Chung demonstrated clear benefits:
Enhanced Operational Efficiency: Stable and consistent power supply streamlined workflows and minimized equipment failures.
Improved Cost Management: Predictable energy costs enabled better budgeting and reduced financial uncertainties.

This project exemplifies how sustainable technologies like BESS go beyond environmental benefits to deliver tangible improvements in construction project performance. From reducing downtime to enabling projects to finish on time and within budget, Leyden Power’s solution supports the fast-paced demands of modern construction.
With Asia’s energy transition moving from policy discussions to practical applications, this partnership at Tung Chung highlights how real-world projects are driving the future of energy management in construction—building smarter today for a sustainable tomorrow.

For more on how Leyden Power’s battery energy storage systems are revolutionizing construction site operations, get in touch with us today.
From consultation to installation and maintenance, we make the switch to clean energy constructive.









