Power Crane Scale at To Kwa Wan Construction Site

Project Name
Construction
Location
To Kwa Wan, Hong Kong
Deployment Time
2025
Client
Wecon Construction & Engineering Limited

Navy CUBE Deployment at To Kwa Wan Construction Site Powering Crane Scale 

Deployment Date: August 2025
Project Location: To Kwa Wan, Hong Kong

At To Kwa Wan construction site on Wing Kwong Street, our Hong Kong construction partner relies on our rugged 400kW Navy CUBE (#BESS) power system to keep operations running smoothly. This system is seamlessly connected to the grid, ensuring tower crane functionality is maintained even when typhoons and severe weather cause interruptions.

The 400kW Navy CUBE (#BESS) provides reliable power to help construction projects maintain momentum in challenging conditions. Its robust build and dependable performance make it an essential asset during challenging weather periods for uninterrupted operations.

Leyden Power BESS SINO

This project, located on Wing Kwong street, was deployed in August 2025, in participation with Wecon and operated by Leyden Power. It involves 400kW BESS model, utilizing fast charging and float charging from the grid to support critical loads for crane scales.

With this solution, construction teams can stay powered and productive, ensuring that weather disruptions do not delay project timelines or operations.

Leyden Power BESS SINO

Leyden Power’s deployment at To Kwa Wan exemplifies how integrated battery energy storage systems (#BESS) can transform traditional industries by providing clean, efficient, and reliable energy—driving Hong Kong closer to a sustainable future.

For more information about the project and Leyden Power’s energy storage solutions, get in touch with us today.

Date: August-2025

Our Gallery

Follow us on LinkedIn​