Deployment Date: September 1, 2025
Project Location: Cheung Sha Wan, Hong Kong
Gammon Construction Limited, one of Hong Kong’s leading construction firms, are facing a common but critical constraint at their Cheung Sha Wan construction site: insufficient grid capacity to power heavy construction equipment.
Tower cranes and construction hoists represent some of the industry’s most power-intensive operations, requiring consistent, high-output energy that exceeded the available grid supply at this location. Traditional solutions would typically involve diesel generators, introducing emissions, noise pollution, and operational complexity to an already demanding construction environment.

Leyden Power partnered with Gammon and deployed a 400kW/633kWh NAVY CUBE Battery Energy Storage System (BESS) at the site. Our NAVY CUBE’s dual input port technology provided the breakthrough solution by connecting to two separate grid sources simultaneously and amplifies their power output to deliver the required capacity.
This innovative approach:

The success of this installation with Gammon Construction reinforces the viability of BESS technology for heavy construction applications and positions clean energy storage as a practical alternative to diesel-dependent operations.
For more information about the project and Leyden Power’s energy storage solutions for your challenges, get in touch with us today.
Date: September-2025
From consultation to installation and maintenance, we make the switch to clean energy constructive.









